Cut and cover without shutting down the street
Cut and cover tunneling is usually the most economical construction method, but it can be highly disruptive, especially in urban areas where excavations are beneath streets or close to utilities and businesses. A temporary traffic deck lessens that disruption.
What is a traffic deck?
A traffic deck ensures safe passage over an active excavation, enabling uninterrupted construction in the excavation while maintaining access above for pedestrians, public vehicle traffic and/or construction equipment.
The most common method uses a site-specific structural steel frame with main girders, intermediate girders and a deck surface of steel, concrete, wood or asphalt. Because site conditions are uncertain, much of the work is done on site during installation.